TSX:LTH.V
Last: 1.00
Change: 0.07
Vol: 497,810

Overview

Lithium Ionic’s properties span 14,182 hectares in Minas Gerais state, Brazil, within an emerging hard rock lithium-producing district coined the “Lithium Valley”, which contains 100% of the country’s official lithium reserves.

Since Lithium Ionic launched in May 2022, its portfolio of properties has increased +10-fold, and the Company continues to assess and consolidate prospective lithium properties in this globally significant hard rock lithium-producing district. 

Its tenements are grouped into two main groups of properties: The Itinga Properties and the Salinas Properties. In July 2023, projects developed within the Itinga and Salinas properties were granted priority status by the state of Minas Gerais regional government bodies, facilitating support and acceleration of approvals and licensing through the development process towards mine operation and production. Read THIS press release to learn more.

The region is home to other notable lithium mines and projects, including the Companhia Brasileira de Lítio’s (CBL) Cachoeira mine, which has been producing lithium since 1993; Latin Resources’ Colina lithium deposit (PEA stage); and Sigma Lithium’s Grota do Cirilo project, which began production in April 2023.

Project Overview

Itinga Group of Properties Salinas Group of Properties
  • Drilling began in April 2022
  • Directly adjacent to lithium producers: CBL’s Cachoeira Mine and Sigma Lithium’s Grota do Cirilo Mine.
  • In Oct. 2023, robust results of a PEA for Bandeira were reported: 
    • Post-tax NPV8%: $1.6B (~C$2.2B)
    • Post-tax IRR: 121%
    • Mine Life: 20 years
    • Avg. annual throughput: 217,700tpa (SC5.5)
    • Pre-tax free cash flow: $243M/year
    • Payback: 14 months
    • All-in OPEX: $349/t SC5.5  
    Bandeira mineral resource estimate (Oct. 2023):
    • M&I: 13.72Mt grading 1.40% Li₂O (474,892t LCE)
    • Inferred: 15.79Mt grading 1.34% Li₂O (523,118t LCE)
  • Outro Lado mineral resource estimate (June 2023):
    • M&I: 2.97Mt grading 1.46% Li₂O (107,599t LCE)
    • Inferred: 0.42Mt grading 1.48% Li₂O (15,168t LCE)
  • Definitive Feasibility Study for Bandeira, including an updated MRE, expected in early 2024
  • Environmental Impact Assessment underway and expected for completion in H1 2024

  • Environmental and Installation License (“LAC”, or Licença Ambiental Concomitante) application submitted in Nov. 2023; approval expected in mid-2024.

Learn more HERE.

  • Acquired in March 2023
  • ~100km north of the Itinga group of properties
  • Directly adjacent to Latin Resources’ Colina lithium deposit
  • Initial 4,000-metre, 24-hole, drill program completed in 2022 returned highlights of:
    • 1.53% Li2O over 11.4m
    • 1.22% Li2O over 13.8m
    • 1.71% Li2O over 9.8m
    • 1.19% Li2O over 13.4m
  • Drilling has been ongoing since May 2023 as part of a 50,000m expansion and definition drilling program in H2 2023 (Itinga + Salinas) to test and delineate multiple outcropping spodumene-rich pegmatite bodies identified by surface sampling and drilling.

  • NI 43-101 mineral resource estimate expected in the near term.

Learn more HERE.

Scroll right to view more

Scroll right to view more

 

 

Subscribe to our Newsletter