TSX: LTH
Last: 0.70
OTCQX: LTHCF
Last: 0.47

News

Lithium Ionic Intersects 1.17% Li2O over 42.05m, incl. 1.95% Li2O over 11.72m at the Galvani Target, Brazil

View PDF version of this release: ENGLISH

TORONTO, Aug. 09, 2022 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTC: LTHCF) (“ Lithium Ionic ” or the “ Company ”) reports additional excellent drilling results from the Galvani claims, on which it is currently conducting a due diligence review following the recently announced binding asset purchase agreement (see press releases dated June 14 and June 28, 2022). The Galvani claims, as well as its neighboring 100%-owned Itinga Lithium Project (Areas 1-5) are located in the state of Minas Gerais, Brazil, in the same district as the lithium producing CBL mine and Sigma Lithium’s Groto do Cirilo project (73.6Mt M&I grading 1.43% Li2O) (see Figure 1, location map).

New Galvani Drill Results Highlights (See Figures 2 and 3)

Previously Reported Exploration Highlights from Galvani Target

Blake Hylands, Chief Executive Officer of Lithium Ionic, comments, “the Outro Lado showing at the Galvani claims continues to show the potential for a significant deposit to be outlined very quickly. The team is gaining a better understanding of the geology and mineralization controls in the area and we are very excited about the opportunity.”

Galvani Claims Due Diligence Update – Excellent Initial Exploration Results

The Company is currently undertaking a 900 metre (7 hole) drill program as well as an extensive trenching program in proximity to an approximately 700 meter strike extent of pegmatite on the Galvani claims, as part of its 90-day due diligence review following the purchase agreement announced on June 14, 2022 (see Figures 2 and 3). The exploration program was designed to confirm historic drilling and determine the structural controls of the mineralized pegmatites, including its orientation with up and down dip testing.

The excellent drill results reported today of 1.17% Li2O over 42.05m, incl. 1.95% Li2O over 11.72m, as well as the previously reported results of 1.57% Li2O over 24.93m, incl. 2.10% Li2O over 7.45m (See press release from July 26, 2022) , are consistent with some of the significant historic drill results which cover roughly one-kilometre along strike including 1.62% Li2O over 20.25m and 1.78% Li2O over 12m .

The Galvani property is located less than 4 kilometres from Sigma Lithium’s Xuxa deposit (over 17Mt grading 1.55% Li2O M+I). The high grade and large widths of the intercepts to date demonstrate excellent potential to outline a significant mineral resource estimate very quickly. Mineralization is hosted in spodumene bearing pegmatites sourced from the same granitic intrusive, which characterizes Lithium Ionic’s Project Area 1, CBL’s lithium mining operation, and Sigma Lithium’s resources (Figure 2).

Table 1. Initial Drill Results from Galvani

  From To Metres Li2O (%) Nb (ppm) Sn (ppm) Ta (ppm)
ARDD-22-002
  11.30 53.35 42.05 1.17 87 141 42
incl. 25.33 37.05 11.72 1.95 88 157 38

Figure 1: Itinga Project (Areas 1-5) and Galvani claims location and geology map. Note the surface expression of Sigma Lithium’s Xuxa deposit directly to east of Galvani claims.

https://www.globenewswire.com/NewsRoom/AttachmentNg/eca569cf-bf78-4aff-a8ef-1857070d92cd

Figure 2: Galvani Pegmatite and Drill Hole Locations

https://www.globenewswire.com/NewsRoom/AttachmentNg/1fa02bea-0877-4c21-917c-c720db194427

Figure 3: Cross Section Showing New Hole ARDD-22-002 and Historic hole OLDD-003

https://www.globenewswire.com/NewsRoom/AttachmentNg/dabdcf22-ee2b-4a65-bf8c-893bad9f3bfa

About Lithium Ionic Corp.
 

Lithium Ionic is a publicly-traded company which owns a 100% ownership interest in the Itinga lithium project in Brazil (the “ Itinga Project ” or the “ Project ”).

The Itinga Project is located in Minas Gerais State (MG), Brazil. The Project comprises five mineral licenses covering more than 1,300 hectares in the prolific Aracuai lithium province. A portion of the Project occurs immediately south of the CBL lithium mine and plant, Brazil’s only lithium producer, and immediately north of the large Barreiro and Xuxa lithium deposits of Sigma Lithium Corp. (TSXV: SGML) (NASDAQ: SGML).

The Project area has excellent infrastructure, including access to hydroelectrical grid power, water, a commercial port, highways and communities. Lithium mineralization (spodumene, lepidolite, petalite) occurs within a halo of pegmatite dikes and apophyses that occur within the rocks surrounding Neoproterozoic granitic intrusions. Mineralization within the mineralized province and the distribution of the mineralized pegmatites is controlled by a complex and crosscutting system of northeast and northwest oriented faults that were exploited by the dikes. Mineralized structures have been identified in two areas within the Project and the remainder of the Project area remains to be explored.

Quality Assurance and Control

During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

Qualified Persons

The technical information in this news release has been prepared by Carlos Costa, Vice President Exploration of Lithium Ionic and David Gower, a director of Lithium Ionic, and both are “qualified persons” as defined in NI 43-101.

For more information please contact:

Lithium Ionic Corp.

Blake Hylands, P.Geo.

Chief Executive Officer

Email: [email protected]

Cautionary Note Regarding Forward-Looking Statements

This press release contains statements that constitute “forward-statements.” Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or “should” and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Project and the Galvani claims, the mineralization and development of the Itinga Project, Galvani claims, the Company’s ability to complete the acquisition of the Galvani claims, the Company’s ability to produce a mineral resource estimate and other mining projects and prospects thereof. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

 

Primary Logo

Join our Email List